Tuesday, 24 May 2011

£588 million funding black hole in Vauxhall Nine Elms Battersea infrastructure

Ok, so I've been a bit of a bad blogger recently, but sometimes I find I can't fit my real life work and spare time projects and activities into 24 hours so I periodically have to drop a few things. In light of all the cuts and planning and development etc. I'm going to try and catch up from where I stopped, so be prepared to be inundated for the next few days.

I left off back in April with a KOV meeting, focused somewhat on the Strategy for the Vauxhall Nine Elms Battersea Opportunity Area, but as one commentator noted, I failed to cover an impromptu note from the floor detailing work performed by David Boardman (and others) from the Kennington Association Planning Forum.  I know that planning matters can be dull, but the big story here is that the KA Planning Forum claim that the funding gap in the Vauxhall Nine Elms Battersea Opportunity Area (mostly on account of the Northern Line infrastructure) is not £58 million, as highlighted by the Development Infrastructure Funding Study (DIFS) (commissioned by the GLA and developers), but a whopping £588 million.  This is a major regeneration news story that has not (as far as I know) been noticed by the mainstream press at all.

I was going to try and write it all out to explain where the money is missing, but it was easier to develop the graph produced by KAPF and add a few explanatory notes.  As you'll see, the first graph shows an admitted £58 million funding gap, but the DIFS study didn't make it very clear that developers were refusing to fund £62 million of required police, health etc. spending and that £63 million funding was supposed to come from borrowing, despite the fact that Wandsworth Council don't like to borrow on account of it being costly to tax payers.  That means that the original deficit was closer to £183 million. You can see it all detailed on this first graph. See the penultimate page of the revised chapter 12 VNEB OAPF for the figures used in Graph 1:


Once the document had been out for a while, KAPF analysed it and found significant weaknesses.  They specifically  sympathised with the company asked to write the DIF study (Roger Tym and Partners) on account of their being asked to "believe a number of implausible things".  So here's a few reasons that KAPF think the developers are wildly optimistic on spend:

*  When working on funding for any transport project, the Department of Transport ask that an optimism bias be added.  This is to account for the fact that major engineering projects are unwieldy and expensive.  In the VNEB OAPF, £800 million was allocated for the Northern Line Extension.  But by the time the DIFS emerged, the optimism bias had been removed and the NLE had been reduced to £564 million (shaded light pink).  KAPF chose to add £130 million (a 23% optimism bias) back into the costs (shaded bright orange).

* Affordable housing was reduced in the DIFS to 15%, despite the fact that Lambeth's Affordable Housing targets are 40%.  If only 15% of the housing built was affordable, the developers would be able to raise a levy of £40k per dwelling.  If  40% of housing built was affordable, a levy of only £25k per dwelling is possible.  High levels of affordable housing would reduce the funding, leaving costs at the same level.

* By assuming lower levels of social housing, there has been an economizing of both healthcare and education costs.  In order to estimate numbers of children for schools, Wandsworth assumed a 10% child yield (1 child in every 10 properties), but child yield in Lambeth is currently 20%.  Wandsworth also removed 25% of children from their calculations on the assumption that they'd be educated privately.  KAPF think that if the midpoint figure of their estimates is used by both councils, a secondary school is definitely required.  That's another unanticipated £74 million (shaded bright yellow) on top of current education provision (shaded light green).  If KAPF are correct in their estimation, they also think that a primary school will need to expand to being four form entry.  If a new primary school is required, the costs go up further (this is not shown on the graph).

* The KAPF review of the infrastructure report goes into plenty more detail over other issues, but I want to provide a broad overview.  By far and away the largest problem is the lack of green space in the VNEB.  It is certainly deficient, and this was proved by the refusal of the Secretary of State to permit the appeal of the developers on the Bondway.  In the Mayor's Planning Framework, the linear park (a long green strip running from Vauxhall to Battersea) was intended to be 1500m long and 50-100m wide, a total of 11.3 hectares.  By the time the developers had finished with their Infrastructure study, they had reduced the total park space to 3.5 hectares!  Assuming it was still to be 1500m long, it would only be approx. 23m in width.  

The national standard for green space is 2.4 hectares of open space per 1000 people,  Lambeth's open space projections assume that the entire Borough will eventually have 1.44 hectares of green space per 1000 people.  If the VNEB were to be constructed with a park of only 3.5 hectares, the area would be unproceedable.  To reintroduce the missing hectares, and bring the VNEB up to the level of Lambeth's most space deficient ward (Ferndale), would cost the developers, by KAPF's  estimations, £200m (shaded bright pink).



So, on a basic reading by a local planning forum, you can see that the sums don't add up.  A deficit of over £588m is not something that can be papered over.  I know that there have been more developments on the VNEB (including the leader of Lambeth Council coming on board for the project) since I updated last month, so I'll blog about that in due course.


Sunday, 7 November 2010

Wandsworth Council and transport / town centre - Part 5 of 5 from Vauxhall Nine Elms Battersea Exhibition VNEB

Finally, just for the record, I wanted to add the final in the series of VNEB exhibition boards. There is so much going on locally that it's difficult to keep up! These boards mostly show Wandsworth Council's outlines on the VNEB, which is importance since the majority of the VNEB falls on their patch.  In my view, the boards aren't quite as useful as the ones that Lambeth Council supplied on account of the fact that they don't summarise all of the buildings that have been granted planning permission to date.  Maybe there are too many to list (or they've not yet been declared), but without an idea of that, it's difficult to imagine the volume of housing and commercial space that will hit the area:


This board clearly outlines the scale of the development.  16,000 new homes means the arrival of a vast number of new residents.  I fail to see how 20,000 - 25,000 new jobs will be created when industrial space is being reduced, but perhaps we'll all be surprised:

Note the mention of the "linear park", linking Vauxhall to Battersea.  This will not provide adequate green space given the likely population density, even once the parks at Spring Gardens and Vauxhall have been taking into account:

The additional 800 primary school aged children will be catered for by /one/ primary school.  Goodness knows whether the other primary schools in the locality can be expanded to meet demand.  The 600 secondary school aged pupils will presumably have to be placed in existing schools.  I'm not sure whether a school feasibility study has been completed, but this /sounds/ a tad unrealistic even to my unknowledgable ears.  Battersea gets a library.  Vauxhall probably won't (but then, libraries aren't really in vogue at the moment, are they?):

Transport.   One of my favourite topics!  This poster indicates improved bus services, new bus routes and increased bus frequency.  It also shows enhanced railway stations (but doesn't mention enhanced services) so this probably just means the stations will get a make over (see here for Vauxhall rail station refurbishment).  Cyclists are mentioned here in terms of "better provision", but it doesn't clearly outline cycle lanes or segregated cycle paths on roads or anything like that.  There's mention of the proposed Northern line tube to Battersea, with an added station at Nine Elms (my favourite option, but it probably wouldn't do much to relieve congestion Kennington tube station).  However, I think the huge cost of this project will eventually mean that the area will get a tram (which is one of the proposed options in the giant VNEB consultation document).  I suppose another option might be to add a new National Rail station between Queenstown and Vauxhall, but looking at the map, this would probably be too far from the power station to meet the new residents' needs:


Here's a model, which I think illustrates how nasty and oversized the new St George tower will look. The architecture is not even particularly imaginative, just a round tall tower.  This model is not illustrative of all of the buildings planned for Vauxhall.  For some reason, some of these have been missed off.  The orange line on the plan is the new proposed tube route:

Just for the record, here are the last few signs up at the exhibition, and completes this rather long and tedious set of plans and photos in the VNEB series.





Part 1 (Ballymore section) of VNEB exhibition is here.
Part 2 (Lambeth Council section) of VNEB exhibition is here.
Part 3 (Tideway Wharf section) of VNEB exhibition is here.
Part 4 (Sainsbury's Towers section) of VNEB exhibition is here.