Tuesday, 24 May 2011

£588 million funding black hole in Vauxhall Nine Elms Battersea infrastructure

Ok, so I've been a bit of a bad blogger recently, but sometimes I find I can't fit my real life work and spare time projects and activities into 24 hours so I periodically have to drop a few things. In light of all the cuts and planning and development etc. I'm going to try and catch up from where I stopped, so be prepared to be inundated for the next few days.

I left off back in April with a KOV meeting, focused somewhat on the Strategy for the Vauxhall Nine Elms Battersea Opportunity Area, but as one commentator noted, I failed to cover an impromptu note from the floor detailing work performed by David Boardman (and others) from the Kennington Association Planning Forum.  I know that planning matters can be dull, but the big story here is that the KA Planning Forum claim that the funding gap in the Vauxhall Nine Elms Battersea Opportunity Area (mostly on account of the Northern Line infrastructure) is not £58 million, as highlighted by the Development Infrastructure Funding Study (DIFS) (commissioned by the GLA and developers), but a whopping £588 million.  This is a major regeneration news story that has not (as far as I know) been noticed by the mainstream press at all.

I was going to try and write it all out to explain where the money is missing, but it was easier to develop the graph produced by KAPF and add a few explanatory notes.  As you'll see, the first graph shows an admitted £58 million funding gap, but the DIFS study didn't make it very clear that developers were refusing to fund £62 million of required police, health etc. spending and that £63 million funding was supposed to come from borrowing, despite the fact that Wandsworth Council don't like to borrow on account of it being costly to tax payers.  That means that the original deficit was closer to £183 million. You can see it all detailed on this first graph. See the penultimate page of the revised chapter 12 VNEB OAPF for the figures used in Graph 1:


Once the document had been out for a while, KAPF analysed it and found significant weaknesses.  They specifically  sympathised with the company asked to write the DIF study (Roger Tym and Partners) on account of their being asked to "believe a number of implausible things".  So here's a few reasons that KAPF think the developers are wildly optimistic on spend:

*  When working on funding for any transport project, the Department of Transport ask that an optimism bias be added.  This is to account for the fact that major engineering projects are unwieldy and expensive.  In the VNEB OAPF, £800 million was allocated for the Northern Line Extension.  But by the time the DIFS emerged, the optimism bias had been removed and the NLE had been reduced to £564 million (shaded light pink).  KAPF chose to add £130 million (a 23% optimism bias) back into the costs (shaded bright orange).

* Affordable housing was reduced in the DIFS to 15%, despite the fact that Lambeth's Affordable Housing targets are 40%.  If only 15% of the housing built was affordable, the developers would be able to raise a levy of £40k per dwelling.  If  40% of housing built was affordable, a levy of only £25k per dwelling is possible.  High levels of affordable housing would reduce the funding, leaving costs at the same level.

* By assuming lower levels of social housing, there has been an economizing of both healthcare and education costs.  In order to estimate numbers of children for schools, Wandsworth assumed a 10% child yield (1 child in every 10 properties), but child yield in Lambeth is currently 20%.  Wandsworth also removed 25% of children from their calculations on the assumption that they'd be educated privately.  KAPF think that if the midpoint figure of their estimates is used by both councils, a secondary school is definitely required.  That's another unanticipated £74 million (shaded bright yellow) on top of current education provision (shaded light green).  If KAPF are correct in their estimation, they also think that a primary school will need to expand to being four form entry.  If a new primary school is required, the costs go up further (this is not shown on the graph).

* The KAPF review of the infrastructure report goes into plenty more detail over other issues, but I want to provide a broad overview.  By far and away the largest problem is the lack of green space in the VNEB.  It is certainly deficient, and this was proved by the refusal of the Secretary of State to permit the appeal of the developers on the Bondway.  In the Mayor's Planning Framework, the linear park (a long green strip running from Vauxhall to Battersea) was intended to be 1500m long and 50-100m wide, a total of 11.3 hectares.  By the time the developers had finished with their Infrastructure study, they had reduced the total park space to 3.5 hectares!  Assuming it was still to be 1500m long, it would only be approx. 23m in width.  

The national standard for green space is 2.4 hectares of open space per 1000 people,  Lambeth's open space projections assume that the entire Borough will eventually have 1.44 hectares of green space per 1000 people.  If the VNEB were to be constructed with a park of only 3.5 hectares, the area would be unproceedable.  To reintroduce the missing hectares, and bring the VNEB up to the level of Lambeth's most space deficient ward (Ferndale), would cost the developers, by KAPF's  estimations, £200m (shaded bright pink).



So, on a basic reading by a local planning forum, you can see that the sums don't add up.  A deficit of over £588m is not something that can be papered over.  I know that there have been more developments on the VNEB (including the leader of Lambeth Council coming on board for the project) since I updated last month, so I'll blog about that in due course.


Tuesday, 10 August 2010

Bondway - Appeal against planning refusal (Part 1: Opening Statement)

The Bondway Tower planning appeal began on 20th July and was presented at Lambeth Town Hall.  Many representatives for the local community met (headed by David Boardman of Kennington Association Planning Forum) to prepare several lengthy documents and then  present them at the Appeal.  Viva Vauxhall mentioned the appeal a while ago, and the documents (which present a strong argument against the erection of the 149 metre Bondway Tower) are available on the Kennington Association Planning blog.

What I'm going to do in a series of blog posts is try to distill the contents of some of the Bondway documents.  The information that David Boardman and co. revealed through a Freedom of Information request from Lambeth is fascinating and I think readers should be aware of the sheer scale of the proposed Bondway development.  The Appeal campaign (mounted by many represenatives from the local community) has probably not received enough exposure, due to its necessarily dense and detailed documents.  I've tried to summarise the info. and only publicise the interesting bits, which will appear over the next week or so in a Bondway Appeal series.  My comments are in red.

Bondway Appeal Series, Part 1 (opening statement):
20th July - Opening Statement to the Bondway Enquiry Document:

The Vauxhall community has not been well served by the planning system.  The gyratory is despised by residents and TFL has failed to engage with the community about how it might be improved.  The Bondway developers hope to "repopulate" what they call a "traffic dominated backwater".  Boardman notes that the area is not in need of repopulation, but would benefit from regeneration. 

Following the Secretary of State's decision to allow the St George Wharf Tower (180m), it's inevitable that developers would want to build a cluster, but planning guidance is not clear how this should happen.  Planning documents are only available in draft eg. Vauxhall Supplementary Planning Document (SPD) and Vauxhall Nine Elms Battersea Opportunity Planning Framework (VNEB), but have not been formally adopted.  The Kennington Association Planning Forum complained that there is no outline plan for the area, but were informed by the Bondway developers that one did exist, and had been used to write the Vauxhall SPD!  A FOI request forced Lambeth Council to reveal the document (named "Vauxhall Urban Design Study").  However, the Urban Design Study revealed a plan for a different cluster of buildings to the one in the VNEB report. 

Ok, if you're still with me (apologies for the acronyms), it appears that the VNEB (document commissioned by the Mayor of London) and the SPD (document commissioned by Lambeth Council) formulated two different plans of what a cluster of tall buildings in Vauxhall would look like.  Surprisingly (given Boris' view on tall buildings), the VNEB study suggested taller buildings in Vauxhall than the SPD study. 

Indeed, the SPD study suggested that the cluster be based around the Vauxhall Triangle / Vauxhall Cross site (that's Kylun's site) with Bondway Tower being shorter than it. Additionally, the Lambeth study (SPD) suggested 40% employment space, and Bondway developers have submitted plans for 10%. More crucially, the Mayor's Density Plan suggests that units should be built at 405 units per hectare.  The Design for London report gives a wider limit of 500 units per hectare.  Bondway Developers wish to house people at 1297 per hectareThis would have serious consequences for residents living in the buildings, and one would imagine that tenants offered social housing would suffer the most (as they inevitably do in such developments).

Boardman noted that Bondway had not provided reasons for departing from providing the originally agreed percentage of social housing.   A concern was also raised about the negative impact the proposed Bondway tower would have on Vauxhall Park.  Additionally, Vauxhall Underground Station is at capacity due to gate line and escalator capacity (gates already have to be closed at times, during rush hour).  Finally, Lambeth (as a borough) has an Open Space deficiency.  Lambeth through the SPD had suggested that additional green space be added to the west of the Bondway site.  Bondway are in favour of this, but want it added using their neighbour's land.  The Kennington Association Planning Forum consider that Bondway should offer Section 106 funding for the purchase of such land, and that the Section 106 monies payable by the applicant should be a considerably larger sum than is ordinarily the case to buy land to mitigate the space deficiency.  They suggest the figure of £10 million.