Showing posts with label cycle paths. Show all posts
Showing posts with label cycle paths. Show all posts

Friday, 7 October 2011

Boris bikers beware - cycle accidents in Kennington on 6th and 7th October

Cyclists, motorists and pedestrians, please be careful on the roads. I noted some time ago that I intend to blog about all cycle accidents, mostly because I think it's very important to offer evidence to TFL on improving road safety for all users, but particularly cyclists and pedestrians.

Yesterday on 6th October 2011, at around 10:15am, a female cyclist (possibly Boris Biker) in her 20s was taken to St Thomas' hospital with minor injuries after having been involved in an accident on Albert Embankment with an ambulance.  The ambulance was flipped on to its side, but both crew members escaped with minor injuries.  It resulted in the closure of Albert Embankment for several hours yesterday.

Today (7th October 2011), a male Boris Biker heading south on Kennington Road near Kennington Cross was involved in an accident with a car.  A witness on Cycle chat noted that the cyclist was knocked unconscious, but came to by the side of the road.

Additionally, I didn't report it at the time, but on 20th September, a male cyclist was involved in an accident with an HGV lorry in Vauxhall Cross near the tube station, in which he suffered serious injuries.

Please be careful cycling through SE11.  There are some very wide and busy A-Roads running through and around Kennington, and we have numerous cycle lanes, a Cycle Superhighway and stacks of London Cycle Scheme aka. Boris Bike docks in the area.  Vauxhall Gyratory and Elephant and Castle roundabout are particularly difficult.

Wednesday, 23 March 2011

Installation of Cycle Hire docks at Cleaver Square, Vauxhall Station and Kennington tube

I've been contacted by the amazing Dawn Rahman of Lambeth Council and asked to inform readers that the new Cycle Hire docks will be installed at Cleaver Square by the 31st of March, but won't be usable until two weeks after that date on account of resourcing issues at TFL.  It seems that extensive remedial works (including re-paving the area) are to be carried out by TFL, but they've not quite got the timing right, so the docking stations won't be accessible until after the paving works have finished!  I don't suppose most people will lament the additional two week wait if the area around Cleaver Street is improved as a result, but I'm grateful for the heads-up from Lambeth. 

The new Cycle Hire docking stations appear to have been started in the tunnel adjacent to the Royal Vauxhall Tavern, extending provision at Vauxhall Station (great news), but they're not yet finished.  Also, I think I spotted that new (ordinary) cycle stands had been installed nearly opposite Kennington tube station (always a good thing as there's never enough places to lock bikes), but we're still waiting for the new Cycle Hire docks to be added at that location.  Also, I noticed an article on a piece of kit, the Cyclehoop, which can be used to transform a piece of street furniture into a secure place to lock a bike.  Does anybody know whether we have any of them in SE11?

I'm certain that there's been a very definite rise in the number of cyclists using Kennington Park Road and Clapham Road and the CS7 Cycle Superhighway.  I expect numbers to rise as we enter summer and as a cyclist, pedestrian and driver, I'd call for more cautious road use from everybody to prevent further accidents.  Also, it would be very useful to have a bike shop in Kennington, as there's rather a dearth between Waterloo and Brixton...  Any entrepreneurs out there?

Tuesday, 30 November 2010

Pedal Power review of Cycle Hire and superhighways from London Assembly Transport Committee

The  London Assembly Transport Committee has released its report, Pedal Power and an accompanying set of survey highlights, on the topic of TFL's Cycle hire (aka Boris/Ken bikes) and the TFL superhighways.

Kennington gets a mention under the "initial issues" of the Cycle hire section on p18:Hopefully we should see improved service in Kennington if Lambeth Council are successfully granted planning permission for the new docks around Albert Embankment, Cleaver Square and Kennington and Oval tube stations etc.  Thanks to Prince's Ward Councillors, who've provided full feedback from Dawn Rahman and a comprehensive review of the suggested docks in the area, and comments upon whose suggestions were taken forward.  Unfortunately, a number of suggested docks were outside of the current zone (although it's unclear where the boundaries lie).  Considering the lack of tubes further south in London, I hope we'll see the scheme extended in the future. Oval/Vauxhall seems an arbitrary cut off and demonstrates a lack of interest by the Mayor in South London infrastructure.

The Pedal Power report, also reviewed the Cycle Superhighways (CS7 runs through Kennington/Oval), and rather alarmingly states:
"Although the cycle superhighways are designed to provide safer cycling routes, it is not clear the pilot routes are achieving this." p27
and
"Whilst in some places there are full advance stop lines of 5 metres depth and mandatory cycle lanes of 2 metres width, elsewhere there are just narrow ‘ghost’ lanes (sections of blue paint without any legal status). However, it is most concerned that there are virtually no measures to reduce motor traffic volumes or speeds." p27
I was very excited about the announcement of the Cycle Superhighways, but despite my initial enthusiasm, back in May 2010, I noted that "the Superhighways are rather rash ideas when they do not give cyclists the room they need to co-exist with buses and cars on trunk routes".

And indeed, on p28, Sustran conclude of the two initial pilot superhighways (CS7 and CS3), "the greatest barrier to Londoners cycling, or cycling more, is fear of traffic yet the cycle superhighways generally follow busy arterial roads and provide no or minimal segregation from traffic. It therefore concludes that in their current form the cycle superhighways have limited scope to facilitate an uptake in cycling, particularly by new cyclists."
"There has been a lack of bikes and available docking points in certain areas, particularly at peak periods. The Committee’s survey revealed [ac lack of bikes and was a particular problem in Covent Garden, Holborn, Kennington, Westminster and Waterloo. One respondent commented: "There is a shocking lack of available docking points in Vauxhall and Kennington. Twice I had to cycle further than I had to travel from where I picked the bike up. Once I was told to take the bike home. Not fun to carry up 4 flights of stairs. I was charged £50…and told to wait 5 days for a refund.""

Tuesday, 15 June 2010

Vauxhall Island Site - KOV Meeting Part 2 (and a meander on to Lambeth Council Housing)

I blogged about Chief Superintendent Ephgrave's appearance at the Kennington Oval and Vauxhall forum on the 9th of June, last week.  But the other segment of the meeting mostly comprised another presentation and chance for questions and answers from the developers of the Vauxhall Island site.  This is the second time the representatives from Kylun Ltd have consulted the community in a public forum, and, better still, encouraged a free-for-all Q&A session.  I'm not going to pretend I suddenly welcome tall buildings, but as their architect commented, "we've always seen this as a location for tall buildings" and the design is considerably more discreet than some of the others presented to the public.

Additional info on. Vauxhall Island Site plans:

The architect opened the discussion by noting that between the buildings, they hope to place an enclosed site and that the commercial spaces would act as provision for local  people and not just residents.   The developers have been meeting with representatives from local parks and other groups and have identified the arches under Vauxhall bridge as opportunities for investment.  Kylun Ltd have also been asked by TFL to look at the possibility of an under the road crossing.  It wasn't entirely clear, but the matter of some additional pedestrian crossings is also under consideration.  The developers say they are happy to fund these.  TFL, however, have to confirm the exact location of any crossings, and are naturally worried about slowing down the traffic (what a good idea!!).  TFL are looking at a range of options concerning the future (or non-future) of the Vauxhall gyratory.

If the building is granted planning permission, one of the ground floor units in the Vauxhall Island site towers (I believe the left hand tower, as you look at the diagram) will be an NHS dentist, and the other part of the floor will be a 70-100 seater digital cinema.  Considering that a swimming pool was unrealistic and out of the question, I'd have said that these are great options.  We don't have a cinema locally so this should make a great addition to Vauxhall.  Above that, there will be three floors of offices (see here for the earlier detailed account, but these could well be work-space type units.  There are questions as to whether these could be subsidised for start-up businesses.  The right hand tower contains a 180 bed hotel and there will be 291 private apartments (spread across both towers, I'm guessing), with a bar on the right hand tower at the13th floor.  There will be provision for 740(ish) bike parking spaces.

SE11_lurker's brief digression on public housing:

[And the affordable housing question?  That's a rather thorny issue, of course.  Lambeth Council have traditionally built huge amounts of public housing whenever they've had the chance, in the 1920s and 1930s, as well as after the war.  It's what keeps people voting Labour, after all.  I tend to be in favour, even though I'd never qualify to live in it, because I believe that the best communities are those where wealth is evenly spread.  I'm not a fan of the free market, left to its own devices, but I make my living from it, and so do many.  Consequently, I like the idea that private housing should fund public and affordable housing.  It seems fair according to a somewhat old-fashioned notion of justice.  But Lambeth has recently seen considerable gentrification in areas like Kennington and Clapham, which of course means that people start to raise the previously unheard of question about whether "we" want that housing, and as usual, the "we" who are asking should probably look around very carefully and ask "who is included?".  Kate Hoey made a very insightful remark at one of the hustings when she commented that single men are very rarely offered public housing.

As though on cue, the Streatham Guardian this week has published figures which suggest that 20,000 people are on the "mainstream housing waiting list", compared with 17,000 last year.  It does rather make one wonder quite where people are living in the meantime.  Does everybody on the list need to be on the list?  How on earth is the housing allocated?  Lambeth claim that their success in housing people just causes more people to apply!  But it should be noted that only eight councils nationally managed to build enough homes according to national requirements.   I doubt that central London, in the middle of a recession, is ever really going to manage to squeeze in all of those extra homes.  And "squeeze" is indeed the notion, because the buildings will have to grow taller to fit in the people.  Lambeth is only seven miles long, after all!  Probably the place to put the most pressure is on the empties.  I keep thinking that the Council ought to come up with a voluntary taskforce, capable of building, plumbing and wiring, who could fix up the houses for those in most desperate need (surely that would be a good co-operative citizen thing to do).  I'd give a Saturday to go and paint a rundown flat, and I can't be the only one.]

Kylun's statement on affordable housing:

It seems that 43% of the public housing would need to be family housing, that is 3 or 4 bed apartments.  Unfortunately, the "final proportion of affordable housing has still be agreed under Section 106".

Q&A


Q.  What is the inspiration behind the design?
A.  The towers are simple and elegant shapes.  They're two sisters, so they spiral up.  The architect takes a different view to the designers of the Shard concerning design.

Q.  What is the timetable?
A.  The designs should be submitted to the Council's planning department within the next fortnight (that's the next week now, since I'm late writing this up).  They anticipate a decision before the end of the year, and will commence the search for a development partner.  If all goes to plan, work should begin on the site in 2015.

Q.  How many people will the building house? (and a second question about cycle safety which was indistinct)
A.  At a guess, the building will house about 600 people.  TFL can answer questions relating to cycle safety.  Apparently, they're coming up with a cycling vision, and running a cycle lane around the back was not seen as acceptable.  [I'm not at all clear on this question, and couldn't work out what "around the back" meant.  Would appreciate clarification from anybody that was there.]

Q.  What about piers, and river transport?
A.  We've struggled with other buildings (not this one, since the Vauxhall Island site is not considered a riverside venture), to get piers into other developments, due to the financial viability of river transport, perhaps due to the fact that it's not subsidised.  We're not in a position to make it happen on site.

[If you're really interested in piers, you might like to read about the work that Caroline Pidgeon did to try and get some on the Albert Embankment.  I wrote about it on my post "whatever happened to Vauxhall pier?"]

Q.  Are you able to favour independent local businesses, rather than give the commercial sites to chains?
A.  We are providing a range of different sized units to try to encourage variety, but it's not clear how we could send potential tenants away if they were over a certain size.

Tuesday, 9 February 2010

Cycle Superhighway CS7 - blue paint oil slick to hit SE11

I'm sure I've mentioned this before, but can't find it in my archives. Part of Boris' masterplan for London is to build a bright blue cycle lane around central London (rather like a sort of environementally friendly version of the M25), with arterial roads leading in from far flung places (such as Balham). Each of the routes is to be called a Cycle Superhighway, but in reality, it will just be lots of (hopefully) well-maintained streaks of blue paint across certain London roads! (I am quite excited, really! I might even start cycling to work!)

The best news is that the first one to be built is going to arrive from far flung Merton, Balham, Clapham etc. and zoom into SE11 past the Oval, up Kennington Park Road, past Kennington tube and provide (at last), a safe route around the Elephant and Castle roundabout. It will go over Southwark Bridge and take you safely to the City. Check out the exact route here.

The piece of paper in my letterbox informs me that the work is due to begin "early in 2010" and that it will be launched in Summer 2010! When it starts, we'll be able to see construction works here, but in the meantime, there's just a Boris video about how much fun it will all be!

Friday, 1 August 2008

My personal quest to make SE11 a bit greener

Following on from a recent article in the East London advertiser that suggested that Vauxhall Cross and Brixton Road are within the top 10 most air-polluted roads in London, perhaps it's time that car drivers other than trades related people or minicab drivers start to reduce their car use. Some of Vauxhall Cross is included in the SE11 area, and I was surprised that one neither Kennington Road, Kennington Lane nor Kennington Park Road were included in the top 10 list, especially considering their proximity to Brixton Road and Vauxhall Cross.

Current petrol prices might encourage the trend to abandon cars in favour of other methods of transport. (C'mon, the Cross River Tram would be a real asset...) I imagine a move from petrol to LPG powered vehicles might help the cause... But best of all, it would be really exciting if London could become more cycle friendly. I was reading an article in the Independent by James Daley who has changed his cycling route from being based around the quiet back streets of Stockwell to a new busy route along the Thames Embankment. Having seen Clapham Road/Kennington Park Road also become a route for cyclist anarchy, I'm not surprised that he notes
"much of my route seems to turn into a cycle racetrack"

I try and cycle responsibly (not going through red traffic lights, sporting bike lights at night etc.) but I hope the trend towards cycling will lead to some form of stiffer penalty for cyclists that break the rules in a dangerous manner. As a driver, cyclist and pedestrian, it's fairly clear to me that cyclists are the worst transgressors of the highway code (especially couriers). On the other hand, there's nothing more frustrating than facing red light after red light when on a bike, because the traffic lights are phased for motorists. Obviously, I'm not suggesting changing all of the lights in favour of cyclists, but some innovative thinking re. roads that could be "cycle only" or more cycle paths (preferably not on pavements) might mean that cyclists could ride around more safely.

Once the move has taken place, I hope to get the trusty old bike out again (am a bit worried about the level of bike theft, so a folding bike might be a better option), and cycle to work where possible. That will probably turn Lurking about SE11 into a list of traffic violation grievances, but hopefully it will also help SE11 go green!

Label Cloud